Palo Verde Canal: Daily Flow
Palo Verde Canal is carrying 654 cubic feet per second (cfs) as of November 23, 2026, 114% of the median for this date (573 cfs).
Flow is up 115 cfs from a week earlier.
Palo Verde Canal at a glance
| Measure | Value |
|---|---|
| Flow leaving the river | 654 cfs (Nov 23, 2026) |
| Median for the date | 573 cfs |
| Percent of median | 114% |
| Change in a week | up 115 cfs |
Palo Verde Irrigation District (Blythe).
Daily flow
| Date | Flow (cfs) |
|---|---|
| Nov 23, 2026 | 654 |
| Nov 22, 2026 | 442 |
| Nov 21, 2026 | 483 |
| Nov 20, 2026 | 585 |
| Nov 19, 2026 | 636 |
| Nov 18, 2026 | 653 |
| Nov 17, 2026 | 583 |
| Nov 16, 2026 | 539 |
| Nov 15, 2026 | 456 |
| Nov 14, 2026 | 613 |
| Nov 13, 2026 | 615 |
| Nov 12, 2026 | 589 |
| Nov 11, 2026 | 532 |
| Nov 10, 2026 | 644 |
Common questions
How much water is Palo Verde Canal taking today?
Palo Verde Canal is carrying 654 cubic feet per second (cfs) as of November 23, 2026, 114% of the median for this date (573 cfs).
Is that normal for this time of year?
It is above normal: 114% of the median for the date, which is 573 cfs.
Source: U.S. Geological Survey. Readings are provisional. About the data
Other diversions
- Adams Tunnel
- All-American Canal
- Azotea Tunnel
- Boustead Tunnel
- Busk-Ivanhoe Tunnel
- Central Arizona Project
- Colorado River Aqueduct
- Colorado River Indian Tribes Main Canal
- Colorado River at the Mexican border
- Dolores Tunnel
- Duchesne Tunnel
- Gila Gravity Main Canal
- Government Highline Canal
- Grand Valley Canal
- Homestake Tunnel
- Hoosier Pass Tunnel
- Moffat Tunnel
- Navajo Indian Irrigation Project
- Orchard Mesa Canal
- Pilot Knob Power Plant and Wasteway
- Roberts Tunnel
- South Canal
- Southern Nevada Water Authority intake
- Strawberry Tunnel (orig.)
- Strawberry → Syar Tunnel
- Twin Lakes Tunnel
- Yuma Main Canal Wasteway