Pilot Knob Power Plant and Wasteway: Return Flow
No water is returning to the river through Pilot Knob Power Plant and Wasteway as of October 31, 2026.
Flow is unchanged from a week earlier.
Pilot Knob Power Plant and Wasteway at a glance
| Measure | Value |
|---|---|
| Flow returning to the river | 0 cfs (Oct 31, 2026) |
| Change in a week | unchanged |
All-American Canal water returning to the river above Morelos Dam.
The newest reading is 24 days old: this gauge is published with a delay.
Daily flow
| Date | Flow (cfs) |
|---|---|
| Oct 31, 2026 | 0 |
| Oct 30, 2026 | 0 |
| Oct 29, 2026 | 0 |
| Oct 28, 2026 | 0 |
| Oct 27, 2026 | 0 |
| Oct 26, 2026 | 0 |
| Oct 25, 2026 | 0 |
| Oct 24, 2026 | 0 |
| Oct 23, 2026 | 0 |
| Oct 22, 2026 | 0 |
| Oct 21, 2026 | 0 |
| Oct 20, 2026 | 0 |
| Oct 19, 2026 | 0 |
| Oct 18, 2026 | 0 |
Source: U.S. Geological Survey. Readings are provisional. About the data
Other diversions
- Adams Tunnel
- All-American Canal
- Azotea Tunnel
- Boustead Tunnel
- Busk-Ivanhoe Tunnel
- Central Arizona Project
- Colorado River Aqueduct
- Colorado River Indian Tribes Main Canal
- Colorado River at the Mexican border
- Dolores Tunnel
- Duchesne Tunnel
- Gila Gravity Main Canal
- Government Highline Canal
- Grand Valley Canal
- Homestake Tunnel
- Hoosier Pass Tunnel
- Moffat Tunnel
- Navajo Indian Irrigation Project
- Orchard Mesa Canal
- Palo Verde Canal
- Roberts Tunnel
- South Canal
- Southern Nevada Water Authority intake
- Strawberry Tunnel (orig.)
- Strawberry → Syar Tunnel
- Twin Lakes Tunnel
- Yuma Main Canal Wasteway